h2cp_karite_burkina_bio_energie.png
h2cp_karite_burkina_bio_energie.png
News - Dec 14, 2018

A new H2CP boiler installed in Burkina for shea butter in the UGF-CDN Farmer Organisation

First replication of the Nununa installation in 2017 of the H2CP boiler room for the production of shea butter as part of the RESIST project with L'Occitane in Burkina Faso

This installation replaces the pots usually used and is composed of the H2CP pyrolysis furnace, a boiler, tanks and a steam system. It allows to carry out the steps of cooking shea butter (hot washing and dehydration) with 100% of residues from processing (shea cakes). 0 waste, 0 wood, 0 smoke!

Related projects